Pizza oven thread

Now to decide which internet person I want to believe on how long I have to wait to build on it
 
Cover with something to hold moisture and wait 4 to 7 days. If only 3 1/2 inches, wait 7. My two bits.
Yeah that's my current plan. It's under a tarp and was going to start dry stacking next week.
 
About done with my dry stack for the block walls. Need two more corner pieces and some angle iron to support the lintle over the front opening.

It's not perfect, but that's what stucco is for 😂

20230718_183807.jpg
 
Back
Top